Tyler competed his Freshman year on Wednesday. I totally forgot to take an end of year photo of him so he will need to do it on Wednesday when Hannah completes 7th grade.
We fired the handyman/contractor on Monday night after he never showed. He claims he was in the hospital and begged us to keep him on board yet he never showed an effort the past few weeks. All he did was mud one day of the week then didn't show for the rest of the week then painted the walls one day of thr week then didn't show the rest of the week then gave us a sob story why he couldn't work.
So this weekend I painted the rest of the walls and me and the boys brought in the vanity and toilet. I installed the toilet and bidet and both are working. The sink isn't working yet cause the drain pipe is too low so I had to buy a flexible pipe and hope it works otherwise we will need to cut the bottom of the vanity. The shower doesn't work yet because I need to install the diverter and spout but the pipe is 3 inches too long so I ordered a pipe cutter. Hopefully once I cut the pipe the spout will screw on and work. I also need to install the door too. Hopefully next weekend everything will be in place and we will have a usable and complete bathroom...over 2 months after we started the reno.